Welding Habitat Solutions

The only patented Habitat system in the UK to have a fully automatic ignition shutdown to assist with hot work projects.

In a positive pressure Habitat, the overpressure is used to prevent ingress of potentially explosive substances and gases. Hot work such as fibre splicing, welding, grinding, cutting and sandblasting can be carried out in areas otherwise considered as hazardous. This allows the execution of hot work during regular operation of oil and gas installations and plants.

The unique automatic ignition shutdown system is a self monitoring system with an automatic shutdown in the event of a failure in components. The automatic shutdown system is initiated when an alarm is triggered due to indicators such as gas, temperature or pressure. 

The Flexi Habitat system ranges from 2m³ to 1500m³ and has been tested and verified by DNV, SIRIM and NENCO. It has a proven track record both onshore and offshore with operators such as BP, Shell and Statoil. 

Our experience combined with market leading equipment when it comes to scalability, flexibility and capacity makes us able to put together a complete project package for the client, with a focus on cost, safety and effectivity.

No matter the challenge or the scope, we will always strive to give the customer the best possible solution for their project.

For more information on our unique hot work Habitat solution please visit stshabitat.com

 


Case Studies

December 2023

 

Scope: Weatherford continuing completions work for CNOOC. The scope was a lower completion of the fibre optic cable....

October 2021 to November 2021

Man Hours: 500+

System Hours: 1500 

Technicians: Habitat Supervisor and Habitat...

October 2020 to May 2021

Man Hours: 1000+

System Hours: 3000 

Technicians: Habitat Supervisor and Habitat...

July 2019 to November 2020

Man Hours: 1200+

System Hours: 2600 

Technicians: Habitat Supervisor and Two...

October 2019 to September 2020

Man Hours: 700+
System Hours: 2600

Technicians: Habitat Supervisor and Habitat...

January 2019 to March 2020

Man Hours: 500+

System Hours: 6000 

Technicians: Habitat Supervisor and Habitat...

April 2016 to March 2019

Man Hours: 1200

System Hours: 19000

Technicians: Habitat Supervisor 

...

positive pressure habitat for welding work inside boiler
August 2016 to September 2016

Work involved: This project involved the supply of our positive pressure Habitat again for Shell to use on their gas refinery plant in Bacton. The...

Paragon MSS1 - drill deck
September 2014 to August 2015

Work involved: This project involved the supply of our innovative positive pressure Habitat to Weatherford for use on the Paragon MSS1. The use of...

Scott - drill deck
November 2015 to February 2016

Work involved: For this project we again supplied Weatherford with our innovative positive pressure Habitat. The use of the habitat on site...

Bacton Gas Terminal
August 2015

Work involved: This project required our innovative positive pressure Habitat to be sealed around the end of one of the boilers on site. The use...

Tantawan Explorer FPSO
January 2012 to February 2012

Work involved: The Tantawan Explorer is a huge FPSO based in the Gulf of Thailand. It handles up to 50,000 bpd of oil and 150 MMSCFD of gas...

Easington terminal
October 2012

Work involved: For this project we supplied Gassco with our innovative positive pressure Habitat. The use of the habitat on site allowed for...

ENSCO 120 - Drill deck
June 2014 to October 2016

Work involved: For this project we supplied Weatherford with our innovative positive pressure Habitat. The use of the habitat on site allowed for...

Petrotrin Refinery
June 2010 to March 2011

Work involved: TOSL are one of the leading suppliers of services and products to  a number of industry sectors in Trinidad and Tobago and the...

Bacton Gas Terminal
August 2014

Work involved: This project required our innovative positive pressure Habitat to be sealed around the end of one of the boilers on site. The use...