Johan Sverdrup

Date: 
December 2017

Work involved:
Assisting the drilling supervisors with the installation of the drilling cable from the top of the derrick.  The project involved the installation of a 28mm polypropylene rope through pulleys, spools, crown block, travelling block and winches, which was then attached to the drilling cable and used to fit the cable in the correct position enabling the drilling equipment to be commissioned into service.  

We were also involved in the replacement of supports for the floodlights on the 30 tonne crane.  We moved the PA system speakers into a new position where they can be reached from deck level for service and maintenance from their original position where they were only able to be accessed using rope access techniques.  

Location: 
Haugesund, Norway