Dunlin Alpha

Date: 
May 2016 to May 2017

Work involved: Protection enclosures were required on the skid deck of the Dunlin Alpha during well decommissioning work. Two pressurised enclosures (4m x 4m x 6m and 4m x 4m x 8m) were built around the transformer unit and MDU to protect from any H2S releases of other combustable gases. Airlocks were utilised to allow easy entry/exit to the units whilst maintaining a safe an pressurised environment inside. Both enclosures were pressurised using our gen 2.1 systems.